Before & After Pad Site

Before After This pad site was created for a manufactured home.  We removed 5 feet of caliche and rock out of the hill  and then added 3 ft of caliche and road base material to level out the pad site to accommodate the manufactured home.  Caliche is a sedimentary rock, a hardened natural cement of calcium carbonate that binds other materials—such as gravel, sand, clay, and silt